METIS Project

With the support of the Energy Transition Fund

Projet METIS

In a context of growth of renewable energies, by nature intermittent, John Cockerill aims at developing high-performance solutions for large-scale hybrid storage, so as to contribute to the available power security, stability and quality in Belgium.

The METIS project* is an innovative prototype for Belgium and Europe, including a hybrid storage system (Li-ion batteries and flow-battery), driven by a high-performance Energy Management System (EMS), and capable of offering multiple flexibility services, which are increasingly necessary for grid operators.

Discover our white papers here!

* Meet the energy transition through innovative storage solutions

Available files

Consommation perdictions

Durable Batteries Analysis

Case Study - Grid-service and autoconsommation

Optimizer and decision-making

Wind power production forecasts

Photovoltaic production forecasts